327
Juanjojsc and to gonedo 9701 er 97ed3 Jud 8918 Jaendojeo 193181
„bejani A8Jnco gnied
.ast 791100)
to awon ond 101 Estenijes et ast tellos aff
.bnuong gij ojsi J99) Ob nevint zaiiq enig dojiq tetaupe "S[**SI
1994/90 Envo13 si♬ bas Junge Joel of nevint 29114 10 2401 o4j sfi
,bum Bogad djam ni totir】 Ens djqet eidenstrenos e oj bejuvsoxe
djim le9b oj (eqnug (7870qrej lo norJo979 SAT
bipode,don97) met sit ojai neje# dɛs71 bas 892 lo sgene91 adj
jiworllik on Jnee9ng
-Tuq 913 70i maji ne esbuloni ajenijas 9df
notilin 900 gurgnug 10 J200 sij 101 es 119* es aqtuq lo sardo-
.agnu9
.an89% od mcl yet a enol189
Purping Sta- -tion.
report on Aster- -shed area. Low level Scheme.
.2XMO# TAMKAMMAH
.MAQ MIMAM
* ddim set disse ne ze Emogizeb 21 #80 mil
.180
.Enucig avoor 9900 bus sogaedi s bne tauong #oled e100 #J91ONDO
I of 8 8 zi meb sd 10 94012 #891jɛqu eḍl
Ecos djix badɔjiq ine 18179jes sariiti tejosige to beanol sqola
.76J70@ Juemeo ni J9a snoje
90 189 met odd to eqois 189nje-awob oedt
26 #9de 21 Ji jenneɗo desweyd sɗj mon) norjeveoxe edj to beanol
.118* 892 e bas gardoned level * at gaijeni#79d 9qole I cJ S &
111* met eds to seed eils 19vo kauons BÅT
and J991 Ol yes lo digeb egerove ne od bøjevaoxe ed of evød
LoJelinos 31 net 191100 add snoted saraient (depot eg nedjie neo
191.00 al 19jie Tuodel 9(1000 to „bajevrOx9 9d A8O JI 9819 10
.bejaigmoo 21 met
-luz 20 9100 AJATON00 edj not doners sål
(689 (178) 219vel geet sit je natjeveox9 9a81 od obim viJ0815-
@ sjencпoc Jaeneo boog djra donent bejevsoxe edju gn1111) yd bas
,beniejdo 9d tluode 98ed JigiJ79JBA
701 Lejenij29 21 9700 91♪ bauong 9vojA BOONBA
Road diver-
-sion.
Estirates.
Abampoa mud
this will be safer than concrete in the event of
any settlement or slips of the general mass of the dam and is
also cheaper.
The roadway over the top of the dam will
form part of the Shaukiwan Road diversion.
The byewash is taken as 300 feet in length
excavated out of the hill-side. A very large amount of excava-
-tion will have to be done in order that the overflow may have
a free run off.
The enlarging of the Fumping Station to
Įtake two more engines and purps, each capable of lifting two
million gallons a day, will bring the power of the station up to
six and a half million gallons a day which is as much as this
Ireservoir can be expected to yield.
An additional rising main will be required
in order to pump this quantity of water without an undue amount
of power being wasted in friction.
The duplication of the rising main will
also be valuable as a stand-by when a pipe bursts.
The diversion of the Shaukiwan road will
commence at the junction of the new road (now in course of
construction) and the Stanley Road, contour round the hillside,
across the earth dan and then follow the stream on the opposite
side of the valley to that on which the existing road runs.
This road diversion will be much shorter
than the existing road and it can have easier gradients.
The estimate for these works is quite rough
and has been prepared on general lines.
it is probable that a tender agreeing with
these prices could not be obtained and that these works could be
carried out cheaper and more expeditiously by administration.
Bth. Webruary, 1905,
(Sa.) D. Jaffe.